New Century Electrical
MAIN BUSINESS
All Categories >
Hydropower project: Electro-mechanical project for small sized hydropower plant
Main supply scope: Turbine, generator, dam forebay gate system, lifting equipment, penstock, inlet valve, excitation system, governor, plant auxiliary mechanical equipment, hydraulic measuring system, medium and high voltage switchgear, auxiliary power supply system, control, supervisory and protect system, metering system, DC power supply system, communication system, lighting system, lightning protection and earthing, main transformer, outdoor step-up switchyard, power cable, etc.
No. 3, Zhixin Road, Shuangfengqiao District, Yubei District, Chongqing, China.
- Tel +86 23 60351559
- Tel
- Feedback
- toTop