Chongqing Fuling Second Water Plant Renovation Project
This water treatment plant has a daily processing capacity of 110,000 tonnes. Following technical upgrades, the elevated service reservoir and the booster pump station now operate in fully automated, coordinated mode, with intelligent adjustment of pump unit operating conditions to reduce energy consumption. Precise control of chemical dosing and disinfection equipment has been implemented, further lowering chemical consumption. The entire water treatment process is now fully automated, enabling one-button sludge discharge and one-button backwashing as required by the process flow.
Keywords:
Hydropower, Substation, and Distribution
Category:
Case Description
This water treatment plant has a daily processing capacity of 110,000 tonnes. Following technological upgrades, the elevated service reservoir and the pressurization pump station now operate in fully automated, coordinated mode, with intelligent adjustment of pump unit operating conditions to reduce energy consumption. Precise control of chemical dosing and disinfection equipment has been implemented, further lowering chemical usage. The entire water treatment process is fully automated, enabling one-click sludge discharge and one-click backwashing as required by the process flow.

Welcome to our message board!
Your voice matters most here. Whether you have valuable suggestions for our products or services, encounter questions that need answering, or would like to share your experience using our offerings, we are eager to listen.
* Please complete the fields above (fields marked with an asterisk are required). We will respond to your feedback as soon as possible.