  • pvc.jpg

Pulong Village PI 30MWp for PV Power Station

The project is located in Huili County, Sichuan Province. After completion, the average annual power generation is 39.397 million kW·h, and the annual utilization hours are 1287.5 hours.

Category:

DETAIL

Overview: The project is located in Huili County, Sichuan Province. After completion, the average annual power generation is 39.397 million kW·h, and the annual utilization hours are 1287.5 hours.

Scope: relay protection, monitoring system, microcomputer five preventions, DC power supply, commissioning, trial operation and personnel training.

 