All Categories >
Nam Kong 2 Hydropower Plant, Laos
Category:
Water head
98.8m
Total installed capacity
66MW (3x22KW)
Type of turbine
Vertical Francis
DETAIL
Work Scope:
1. Equipment supply: Supervisory control and protection system
2. Technical service: installation, adjusting and testing, commissioning; site training
Hydropower
Next
Next
OTHER PRODUCTS
I WANT TO CONSULT