Huanza Hydropower Plant, Peru
Category:
Total installed capacity
92.6MW (2x46.3MW)
Type of turbine
Pelton
The installed height
3351.5m
Average annual output
3.674x108kW.h
DETAIL
Work Scope:
1. Equipment supply: Supervisory control system
2. Technical service: Installation guidance, adjusting and testing, commissioning; site training